JLM Mechanical and Electrical have recently completed their renovation of the facilities at Headingley Stadium in Leeds as part of a £40million redevelopment. JLM were responsible for the design, supply and installation of a range of mechanical and electrical works at the stadium that can hold 17,500 people:
- Supply of new cable feeds and shortening existing cable feeds
- Isolation of stand
- Strip out of redundant services
- New small power board for lighting and power
- Switch fuse isolator
- Time laps socket
- Re-routing CCTV camera
- Supply and insulation of galvanised steel trunking and and flexible galvanised steel conduit
- Supply and insulation of PVC trunking and flexible PVC
- Re-routing try zone building water supply and insulating
- Mechanical services within the Pavilion building/ North Stand
- De-commissioning pavilion building
- Gate house supplies and making staircase safe